...
首页> 外文期刊>International Journal of Environmental Research and Public Health >A Review of the Water and Energy Sectors and the Use of a Nexus Approach in Abu Dhabi
【24h】

A Review of the Water and Energy Sectors and the Use of a Nexus Approach in Abu Dhabi

机译:阿布扎比的水和能源部门回顾以及Nexus方法的使用

获取原文
           

摘要

Rapid population increase coupled with urbanization and industrialization has resulted in shortages of water in the Middle East. This situation is further exacerbated by global climate change due to greenhouse gas emissions. Recent research advocates that solutions to the global water security and scarcity crisis must involve water–energy nexus approaches. This means adopting policies and strategies that harmonize these inter-related sectors to minimize environmental impact while maximizing human benefit. In the case of Abu Dhabi, when designing and locating oil/gas refineries and associated power generation facilities, previous relevant decisions were based on simple economic and geographical grounds, such as nearness to oil rigs, pipelines, existing industries and port facilities, etc. The subsequent design and location of water abstraction and treatment works operated by the waste heat from these refining and/or power generation processes was catered for as an afterthought, meaning that there is now a mismatch between the water and energy supplies and demands. This review study was carried out to show how Abu Dhabi is trying now to integrate its water–energy sectors using a nexus approach so that future water/power infrastructure is designed optimally and operated in harmony, especially in regard to future demand. Based upon this review work, some recommendations are made for designers and policy makers alike to bolster the nexus approach that Abu Dhabi is pursuing.
机译:人口的迅速增加,加上城市化和工业化,导致中东缺水。由于温室气体排放造成的全球气候变化进一步加剧了这种情况。最近的研究主张,解决全球水安全和稀缺危机的解决方案必须涉及水-能源联系方法。这意味着要采取协调这些相互关联的部门的政策和战略,以最大程度地减少对环境的影响,同时最大限度地提高人类利益。就阿布扎比而言,在设计和定位油气精炼厂及相关发电设施时,先前的相关决策是基于简单的经济和地理基础,例如与石油钻机,管道,现有工业和港口设施的距离等。这些提炼和/或发电过程中产生的废热所进行的取水和污水处理厂的后续设计和选址是事后的事,这意味着水和能源的供需之间存在不匹配。进行了这项审查研究,以表明阿布扎比现在如何尝试使用联系方法整合其水能部门,以便未来的水/电基础设施得到最佳设计并协调运行,尤其是在未来需求方面。根据这项审查工作,为设计人员和决策者提出了一些建议,以支持阿布扎比追求的联系方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号