Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan

机译:影响公共建设项目时间超支的因素:以约旦为例

获取原文
           

摘要

Most construction projects in developing countries are characterized by overruns in time. This research wasconducted in an attempt to identify major factors for such overruns in the typical developing environment ofJordan. A descriptive study was carried out and two types of data were collected. The overrun variables wereextracted from the literature and from a thorough examination of the perception of 30 engineers, and then rankedaccording to their Severity Index (the product of Importance Index and Frequency Index). The top ten factorscausing time overruns in construction projects were identified and treated using Principal Component and FactorAnalysis (PCFA). After conducting the analysis on both the secondary and primary data, results showedagreement only on one cause, weather conditions.
机译:发展中国家的大多数建筑项目都有时间超支的特点。进行这项研究是为了找出在约旦典型的发展环境中造成此类超支的主要因素。进行了描述性研究,并收集了两种类型的数据。从文献中提取超支变量,并从对30位工程师的看法进行彻底检查中提取出超支变量,然后根据其严重性指数(重要性指数和频率指数的乘积)进行排名。使用主成分和因子分析(PCFA)识别并处理了导致建设项目时间超支的十大因素。对次要和主要数据进行分析后,结果仅在一个原因(天气条件)上达成了一致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号