...
首页> 外文期刊>International Journal of Sustainable Construction Engineering and Technology >Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant
【24h】

Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant

机译:马拉大型建筑项目中影响施工成本的因素:项目管理顾问的观点

获取原文
           

摘要

Project cost is one of the most important criteria of success of project and is of high concern to those who are involved in the construction industry. However, studies show that rarely projects are complete within stipulated budget. This study is focusing on identification of significant causes affecting construction cost in MARA large projects. This paper presents the results of a questionnaire survey conducted among the personnel of Project Management Consultant (PMC). Data was analyzed with statistical tools to determine the rank of factors affecting construction cost. It is concluded that cash flow and financial difficulties faced by contractors, contractor's poor site management and supervision, inadequate contractor experience, shortage of site workers, incorrect planning and scheduling by contractors are most severe factors while changes in scope of project and frequent design changes are least affecting factors on construction cost. Spearman correlation analysis showed that incorrect planning and scheduling by contractor has strong positive relationship with contractor’s poor site management and supervision, inadequate experience of contractors has strong positive relationship with incorrect planning and scheduling; and contractor’s poor site management and supervision, changes in scope of project has strong positive relationship with frequent design changes; and vice versa.
机译:项目成本是项目成功的最重要标准之一,并且是那些从事建筑行业的人所高度关注的。但是,研究表明,很少有项目在规定的预算范围内完成。这项研究的重点是确定影响MARA大型项目建设成本的重要原因。本文介绍了在项目管理顾问(PMC)的人员中进行的问卷调查的结果。使用统计工具对数据进行分析,以确定影响建筑成本的因素等级。得出的结论是,承包商面临的现金流和财务困难,承包商的现场管理和监督不力,承包商经验不足,现场工人短缺,承包商的错误计划和进度安排是最严重的因素,而项目范围的变化和频繁的设计变更则是最主要的因素。对建筑成本影响最小的因素。 Spearman相关分析表明,承包商错误的计划和进度与承包商不良的现场管理和监督有很强的正相关关系,承包商经验不足与错误的计划和进度有很强的正相关关系。承包商的工地管理和监督不力,项目范围的变更与频繁的设计变更有着密切的正相关关系;反之亦然。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号