首页> 外文期刊>Estudios Geograficos: Estudios Geográficos >Ilustración y Riegos: la Real Acequia del Jarama en el siglo XVIII
【24h】

Ilustración y Riegos: la Real Acequia del Jarama en el siglo XVIII

机译:插图与灌溉:18世纪的真正Acequia del Jarama

获取原文
           

摘要

The Jarama Royal Channel was one of the first hydraulic developments in the 18 century, and thus, an exponent of the problems posed and the efforts made in order to improve Madrid's water supply. Proyected in the 16 century, stasted to be built in 17 century, was not finished until 1740. Nevertheless in the was only used for a short time due to the fact that it was soon affected by leaking and lanslide problems, which hindered its normal working process till well in the 20 century. The issues studied ar building problems, the main protagonists as well as the rules of irrigation, clear precedents of later publics works of great significance for our country.
机译:贾拉玛皇家海峡是18世纪最早的水力开发项目之一,因此,为改善马德里的水供应而出现的问题和做出的努力也得到了广泛的评价。在16世纪受保护,直到1740年才建成,直到1740年才完工。尽管如此,由于受泄漏和滑坡问题的影响,它只能在很短的时间内使用,从而阻碍了其正常工作直到20世纪为止。这些问题研究了建筑问题,主要的主人公以及灌溉的规则,后来的公共工作的明确先例对我国具有重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号