...
首页> 外文期刊>Nature environment and pollution technology >Analysis of Runoff Changes of Niqu River in Water Diversion Area of Western Route Project of South-North Water Transfer Project
【24h】

Analysis of Runoff Changes of Niqu River in Water Diversion Area of Western Route Project of South-North Water Transfer Project

机译:南水北调西线工程调水区尼曲河径流变化分析

获取原文
           

摘要

The runoff data of Zhuba Station at Niqu river in water diversion area of Western Route Project (WRP) ofSouth-North Water Transfers Project (SNWTP) from 1961 to 2010 were applied to estimate the coefficientsof variation of hydrology, the peak pattern degree, and ample flow VS low flow, climate tendency rate and soon. The results were used to analyse the effects of hydrological regime on river discharge in the water supplyarea of the first stage project in WRP. The results demonstrated that: The annual river discharge is increasingin Niqu River which is the water supply area in the first stage project of WRP. The cumulative increased riverdischarge is 0.52×10 8 m 3 within 50 years which is 2.6% larger than the average value. The runoff increasedeach year in non-flood season and decreased each year in flood season.
机译:利用南水北调西线工程(WRP)引水区尼曲河竹坝站1961-2010年的径流数据,估算了水文变化系数,峰型度和水量。流量VS低流量,气候趋势率快。结果用于分析水文项目对WRP一期工程供水区域河流排放的影响。研究结果表明:尼曲河是WRP一期工程的供水区域,年河流流量正在增加。 50年内河水累计增加流量为0.52×10 8 m 3,比平均值大2.6%。在非汛期,径流每年增加,而在汛期,径流每年减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号