Due to the advantages such as high efficiency of electricity generation and high degree of cleanness, Integrated Gasification Combined Cycle (IGCC) power plant represents the direction of development for all fired power plants in China. This essay analyzes the technical requirements and economic attributes of the Chinese IGCC power plant of 400 MW level in plan. It is both necessary and possible for China to develop IGCC power plant with the technical foundation available. The biggest obstacle facing the development of IGCC is the huge amount of investment and high cost of electric generation. According to the sensitivity analysis, investment is the main element affecting the cost of power generation. Though it is difficult to control investment in the present phase, with restricting elements like technique and facility, smooth operation of the project could still be ensured through government’s preferential policies toward IGCC power plant, such as setting price for clean electricity, offering investment subsidies and preferential taxes. The premise for such policies is a determined and consistent development strategy of IGCC technique.
机译:由于具有发电效率高和清洁度高等优点,整体煤气化联合循环(IGCC)电厂是中国所有火力发电厂的发展方向。本文在规划中分析了中国400兆瓦级IGCC电厂的技术要求和经济属性。在现有技术基础上发展中国的IGCC发电厂既是必要的,也是可能的。 IGCC发展面临的最大障碍是大量的投资和高昂的发电成本。根据敏感性分析,投资是影响发电成本的主要因素。尽管目前阶段难以控制投资,但由于技术和设施等限制因素,通过政府对IGCC电厂的优惠政策,例如设定清洁电价,提供投资补贴和补贴等,仍可确保项目的平稳运行。税收优惠。制定此类政策的前提是IGCC技术的确定且一致的发展策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号