Quantity Surveying Firm Change Model In Managing The Constraints Of Bim Implementation

机译:Bim实施约束管理中的数量测量公司变更模型

获取原文
           

摘要

Recently, Building Information Modelling (BIM) has been introduced and promoted as a process which enables quantity surveyorsto carry out their roles more effectively, increasing productivity and accuracy especially in Quantity take-off or Measurement. Withthe implementation of BIM, most of the quantities can be easily abstracted from 3D models and complete product information canbe directly transferred into Bills of Quantities and cost estimation. Nevertheless, Quantity Surveyors’ roles in BIM which have beenintroducing in previous years are unable to comply with BIM practices. Therefore, this paper aims to review the QuantitySurveying practices in managing the constraints of BIM implementation in Kotter’s change model. The reviewed result indicatesthat culture constraints and process constraints have to be resolved in the initial stage of implementing BIM for consultantQuantity Surveying firms, followed by technological constraints and policy constraints. This reviewed result serves as a guidancefor Quantity Surveying firms in planning their changes in BIM implementation in future.
机译:最近,建筑信息模型(BIM)已被引入和推广,该过程使工程测量师能够更有效地发挥作用,从而提高生产率和准确性,尤其是在工程量估算或测量中。通过实施BIM,可以轻松地从3D模型中提取大多数数量,并且可以将完整的产品信息直接传输到工程量清单和成本估算中。但是,前几年引入的数量测量师在BIM中的角色无法遵守BIM惯例。因此,本文旨在回顾在Kotter变更模型中管理BIM实施约束的数量调查实践。审查结果表明,在为顾问量测公司实施BIM的初期,必须解决文化约束和流程约束,其次是技术约束和政策约束。审查的结果可为数量测量公司在将来计划其BIM实施变化时提供指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号