...
首页> 外文期刊>Open Journal of Geology >Geological Model of Mae Tang-Mae Ngad Diversion Tunnel Project, Northern Thailand
【24h】

Geological Model of Mae Tang-Mae Ngad Diversion Tunnel Project, Northern Thailand

机译:泰国北部湄唐湄湄河引水隧洞工程地质模型

获取原文
           

摘要

Most of infrastructure projects around the world have to focus on a clear understanding of geological model which may be determined from various sources of information. The limitation in geotechnical data and budget affects the accuracy of the geological model, particularly for projects of long and deep tunnel of which accessibility to the excavation points is difficult and far reaching. Therefore, an approach adopted for interpretation plays an important role in the level of uncertainty of the derived geological model. This paper focuses on the determination of the geological models at the site of a long water diversion tunnel project in a complex geologic setting in northern Thailand from an approach to understand the relationship between regional tectonic setting and local tectonic condition so that geological structures and rock mass conditions along the tunnel alignment can be assessed for a better planning of tunnel design and construction. The paper describes tectonic settings at regional scale (Northern Thailand and Eastern Myanmar), tectonic features and geologic condition in project area, geotechnical investigation and data along tunnel alignment and predicted tunnel ground behavior.
机译:世界各地的大多数基础设施项目都必须专注于对地质模型的清晰理解,而地质模型可能是由各种信息来源决定的。岩土数据和预算的限制会影响地质模型的准确性,特别是对于长而深的隧道项目,这些项目难以接近开挖点并且影响深远。因此,用于解释的方法在导出的地质模型的不确定性方面起着重要作用。本文着眼于通过了解区域构造环境与局部构造条件之间的关系,从而了解地质构造和岩体的方法,确定泰国北部复杂地质环境中长导水隧洞工程现场的地质模型。可以评估隧道路线沿线的条件,以更好地规划隧道设计和施工。本文介绍了区域规模(泰国北部和缅甸东部)的构造环境,项目地区的构造特征和地质条件,岩土勘察以及沿隧道定线的数据和预测的隧道地层行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号