...
首页> 外文期刊>South African journal of industrial engineering >IMPROVING THE RESPONSE TIME FOR THE CORRECTIVE MAINTENANCE OF RAIL INFRASTRUCTURE: A CASE STUDY OF THE WESTERN CAPE PASSENGER RAIL NETWORK
【24h】

IMPROVING THE RESPONSE TIME FOR THE CORRECTIVE MAINTENANCE OF RAIL INFRASTRUCTURE: A CASE STUDY OF THE WESTERN CAPE PASSENGER RAIL NETWORK

机译:改善铁路基础设施维修的响应时间:以西开普客运铁路网为例

获取原文
           

摘要

Response time for repairing rail infrastructure failures remains a challenge? in the South African rail industry. The ‘mean time to return’ metric consists of? mean time to respond? and? mean time to repair . This article investigates the mean time to respond for signalling infrastructure at the Passenger Rail Agency of South Africa (PRASA) in the Western Cape, and introduces a strategy to reduce downtime. The results show that the time of occurrence, the location, and the nature of incidents, as well as the location of maintenance personnel, influence the time to respond. A model is developed to assist with improved decision-making.
机译:修复铁路基础设施故障的响应时间仍然是一个挑战吗?在南非铁路行业。 “平均返回时间”指标包括?平均响应时间?和?平均维修时间。本文调查了西开普省南非旅客铁路局(PRASA)响应信号基础设施的平均时间,并介绍了减少停机时间的策略。结果表明,事件发生的时间,位置,事件的性质以及维护人员的位置都会影响响应时间。开发了一个模型来帮助改进决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号