首页> 外文期刊>Water Science >Improving the hydraulic efficiency of Ibrahemia canal
【24h】

Improving the hydraulic efficiency of Ibrahemia canal

机译:提高伊布拉西米亚运河的水力效率

获取原文
           

摘要

Ibrahemia canal is one of the longest irrigation canals in Egypt. It starts at 400m upstream of Asuit barrages and ends in Giza Irrigation General Directorate of 316.300km length. The canal cross section is bounded in many reaches along canal length by railway line in right bank and Cairo-Aswan agriculture road in left bank. The canal passes through many cities and residential areas, its cross section is affected negatively due to interpenetrate with road section and railway lines. Wastes and deposits increase the contraction of canal cross section. The reach from km 122 to km 132 which located within El Menya City is one of the most critical reaches owing to its length, complicity of maintenance and its effect on canal water hydraulic gradient. The objective of the study is to introduce the most convenient maintenance program to improve the hydraulic efficiency of the studied reach and reduce the loss in water levels along it, also to insure that the reach is capable of passing the required discharge to downstream reaches. The canal cross sections were surveyed along the study reach, the flow velocities were measured and flow discharge was calculated. The study reach was simulated using one dimension mathematical model (SOBEK 1D) to predict the change of hydraulic parameters of the study reach after the execution of the suggested training programs. Finally four maintenance scenarios were suggested and evaluated hydraulically to improve the hydraulic efficiency of the selected reach of Ibrahemia canal.
机译:伊布拉希米亚运河是埃及最长的灌溉运河之一。它始于阿苏特河上游400m,结束于吉萨灌溉总局,全长316.300km。运河的横截面沿河段的长度沿河段有很多范围,右岸是铁路线,左岸是开罗-阿斯旺农业公路。运河穿过许多城市和居民区,其断面由于与路段和铁路线的相互渗透而受到负面影响。废物和沉积物增加了运河横截面的收缩。由于其长度,维护的复杂性及其对运河水力梯度的影响,位于埃尔门尼亚市内的122公里至132公里的距离是最关键的距离之一。该研究的目的是引入最方便的维护程序,以提高所研究河段的水力效率并减少沿河水位的损失,并确保该河段能够将所需的排放物传递至下游河段。沿着研究范围调查运河的横截面,测量流速并计算流量。使用一维数学模型(SOBEK 1D)对研究范围进行了模拟,以预测执行建议的培训计划后研究范围的液压参数的变化。最后,提出了四个维护方案并进行了水力评估,以提高伊布拉希米河选定河段的水力效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号