首页> 外文期刊>Transportation Research Procedia >Experiences with Capacity Reductions on Urban Main Roads – Rethinking Allocation of Urban Road Capacity?
【24h】

Experiences with Capacity Reductions on Urban Main Roads – Rethinking Allocation of Urban Road Capacity?

机译:城市主要道路通行能力下降的经验–重新思考城市道路通行能力的分配?

获取原文
           

摘要

This paper presents results from a study concerning effects and consequences of a temporary (one year) capacity reduction on an urban main road tunnel in Oslo, Norway. The main findings are that reduction of the road capacity from in total four to two lanes in the Smestad tunnel, carrying about 50 000 vehicles per workday, caused few or no effects or consequences. Three months after the capacity reduction was implemented, traffic volumes were about the same as before, there are only small increases in delays, and the road users (commuters and freight traffic) have not made significant adaptions.
机译:本文介绍了一项有关在挪威奥斯陆的城市主干隧道上暂时(一年)减少通行能力的影响和后果的研究结果。主要发现是,Smestad隧道的道路通行能力从总共四个车道减少到两个车道,每个工作日载运约5万辆车,几乎没有影响或没有影响。实施减容三个月后,交通量与以前大致相同,延误仅小幅增加,道路使用者(通勤和货运)没有做出重大调整。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号