Dynamic Risk Modelling for Optimizing Earthmoving Operations

机译:用于优化土方作业的动态风险建模

获取原文
           

摘要

Scheduling and cost estimating of the construction project are interdependent management functions despite the fact that different teams may be responsible for their respective development. Realistic project schedules and accurate cost estimates depend largely on the measures taken to account for uncertainties inherent in their development. This paper aims to present a newly developed methodology; and is designed to integrate the two functions and dynamically accounts for uncertainties associated with each function. The paper focuses primarily on earthmoving operations. The research methodology utilizes simulation based optimization to generate near-optimum fleets and estimate project total cost, while considering the uncertainties associated with project duration, direct and indirect cost dynamically over the project duration. The developed methodology is expected to provide contractors with a better understanding of the dynamic nature of uncertainties on large construction projects and their impacts on generated project schedules and cost estimates. To validate the proposed methodology and to illustrate its capabilities, it was applied to two example projects.
机译:尽管不同的团队可能负责其各自的开发,但建设项目的计划和成本估算是相互依赖的管理功能。现实的项目进度表和准确的成本估算在很大程度上取决于所采取的措施,以考虑其开发中固有的不确定性。本文旨在介绍一种新开发的方法。旨在整合这两个功能,并动态说明与每个功能相关的不确定性。本文主要关注土方作业。该研究方法利用基于仿真的优化来生成接近最优的车队并估算项目总成本,同时考虑与项目工期有关的不确定性,在项目工期中动态地产生直接和间接成本。预期所开发的方法将使承包商更好地了解大型建筑项目不确定性的动态性质及其对生成的项目进度表和成本估算的影响。为了验证所提出的方法并说明其功能,将其应用于两个示例项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号