Documents received during the tender, are in the form of drawings, specifications, bill of quantity (BQ), and the general terms of the contract. Tender activity will bring a variety of risks during the project implementation, and this research is done to identify and assessment of risks, mitigating risk and determining the ownership of the dominant risk.The research was conducted on a private building construction project at Badung Regency in Bali, by using a qualitative method and data collection was done through interview, brainstorming with experts and questionnaires. Among the 39 risk identified, 15 risks were obtained from the previous research, and the remaining 24 risks in this research.The results of this risk assessment were that 18 risks (46.2%) categorized into unacceptable, that include: the addition items of work, the drawing does not match with plan, and the changes in the material specifications. Risk assessment fell into the undesirable category that 21 risks (53.8%), including the mismatch information from planners, the arithmetic error, and materials used were not available on the market. Mitigation was done to dominant risk, among others by reassessing, submitting the contract change order, and asking questions. The biggest risk of ownership was the contractor, namely 39 risks with 18 unacceptable and 21 undesirable risks, this mean, problems associated with tender documents should receive the attention to contractors, planner consultants, owners and Quantity Surveyor (QS) consultants. Contractors as the recipient of the biggest risk were expected to increase the competence of those involved in the tender process.
机译:招标过程中收到的文件包括图纸,规格,数量清单(BQ)和合同的一般条款。招标活动将在项目实施过程中带来各种风险,该研究旨在识别和评估风险,减轻风险并确定主要风险的所有权。该研究是在巴东摄政区的一个私人建筑项目上进行的。巴厘岛采用定性方法,并通过访谈,与专家集思广益和问卷调查收集数据。在识别出的39种风险中,有15种来自先前的研究风险,其余24种来自风险研究。本风险评估的结果是18种风险(46.2%)被归类为不可接受,包括:工作的增加,工程图与平面图不符,以及材料规格的变更。风险评估属于不受欢迎的类别,有21种风险(53.8%),包括计划人员的不匹配信息,算术错误和使用的材料在市场上不可用。减轻了主要风险,其中包括通过重新评估,提交合同变更单和提出问题来进行。拥有权的最大风险是承包商,即39种风险,其中18种不可接受,21种不良风险,这意味着与招标文件相关的问题应引起承包商,规划师,业主和数量测量师的注意。承包商是承担最大风险的承包商,可以提高参与招标过程的人员的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号