Inspection Scheduling Programs Analysis of Amine Reboiler Heat Exchanger Using Risk-Based Inspection API 581 Method

机译:使用风险基于风险检查API 581方法检查胺再沸器热交换器的检测调度程序分析

获取原文
           

摘要

In the oil and gas industry, the purification and handling of oil and petroleum gas, the cycle of warmth transformation is expected to isolate the H2S and CO2 from natural gas with an amine. The cycle happens inside the amine reboiler which is a shell and tube heat exchanger type. Cycle liquid streaming in the Amine Reboiler are Lean Amine on the shell side (HEXSS) and Therminol-55 on the cylinder/tube side (HEXTS). With such synthetic arrangement, worked with high weight and temperature, makes the liquid into a destructive climate for Amine Reboiler. Along these lines, an exact review and planning program is needed to guarantee equipement’s life, guaranteeing the protected establishment and wellbeing of laborers. Thus, it is important to direct a danger assessment for shell and tube heat exchanger gear utilizing the Risk-Based Inspection technique which alludes to the API RP 581. The danger of Amine Reboiler is a mix of the Probability of Failure (PoF) and the Consequence of Failure (CoF). From the PoF and CoF acquired, the HEXSS hazard level on the danger lattice at the RBI date and RBI plan date are ordered as Low Risk and Medium Risk. While the danger level of HEXTS on danger network at RBI date and RBI plan date both are ordered as Medium-High Risk. At that point the prescribed date to do the assessment is January 1, 2020.
机译:在石油和天然气工业中,石油和石油气体的净化和处理,预期温暖转化的循环将与胺将H2S和二氧化碳分离出来。该循环发生在胺再沸器内,这是壳和管热交换器型。甘氨酸再沸器中的循环液体流是壳侧(六六角)的贫胺和气缸/管侧(透明)上的热门-55。具有这种合成布置,用高重量和温度工作,使液体变成胺再沸器的破坏性气候。沿着这些线条,需要一个确切的审查和规划计划来保证设备的生活,保证受保护的劳动者的建立和福祉。因此,利用基于风险的检查技术引导壳和管热交换器齿轮的危险评估是重要的,这是API RP 581的风险的检查技术。胺再沸器的危险是失败(POF)和概率的混合失败的结果(COF)。从POF和COF获取,RBI日期和RBI计划日期的危险格的危险水平被命令为低风险和中等风险。虽然RBI日期和RBI计划日期的危险网络的危险程度均被命令作为中高风险。此时评估的规定日期是2020年1月1日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号