首页> 外文期刊>Journal of Building Construction and Planning Research >Simulation on Sequential Construction Process and Structure of the Pisa Tower
【24h】

Simulation on Sequential Construction Process and Structure of the Pisa Tower

机译:比萨塔顺序施工过程与结构的仿真

获取原文
           

摘要

The leaning of structures happens all around the world and generates impacts on different extents; thus, it is important to learn about the causes behind. In this report, the sequential construction of a typical leaning structure, the Tower of Pisa, is discussed and simulated by using a finite element code, PLAXIS. The simulation is performed on a two-dimensional plane with simplifications taken into consideration in making modeling feasible under limitations. Three distinct models are built with one as a control variable, while the other two models are set up with exact eccentricity. Data are obtained from the analysis and are plotted in a graph to clearly show the relationship between the tilting angle and construction phases. With reasonable and completed simulation, the study is able to show the significant role compressible subsoil plays in impacting the tilting performance of a tall building.
机译:结构倾向于世界各地都发生,并对不同的范围产生影响;因此,重要的是要了解后面的原因。在本报告中,通过使用有限元码,典型的倾斜结构,比萨塔的典型倾斜结构的顺序结构。在二维平面上执行模拟,以考虑到在限制下进行建模的简化。三个不同的模型是用一个作为控制变量的模型,而另外两个模型是以精确的偏心设置的。数据是从分析中获得的,并且在图中绘制以清楚地示出倾斜角度和施工阶段之间的关系。通过合理和完成的模拟,该研究能够展示可压缩的子机在影响高层建筑的倾斜性能方面发挥着重要作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号