A column system for modeling bentonite slurry infiltration in sands

机译:砂岩中膨润土泥浆渗透型柱系统

获取原文
           

摘要

Pressurized bentonite slurry is applied on a tunnel face to form a filter cake to stabilize the tunnel face when the slurry shield excavates through the sandy soil. Failure of the tunnel face may be caused by a high permeable filter cake, which commonly has a long penetration distance of slurry in sands. A column system with a height of 680 mm and a diameter of 300 mm was developed to model pressurized slurry infiltration in sands. Pressure transducers were installed to estimate the hydraulic conductivity of the filter cake during slurry infiltration. The electrical conductivity of the leachate of collected samples was measured. Results show that the majority of fine particles in slurry are within the range 100–300 mm into the sand specimen. The time for forming an impermeable filter cake is about 300 s, which indicates the impermeable filter cake is hard to form during the excavation.
机译:加压膨润土浆料施加在隧道面上,以形成滤饼,以在浆料屏蔽通过砂土挖掘时稳定隧道面。隧道面的故障可能是由高渗透滤饼引起的,这通常具有砂浆中浆料的长渗透距离。高度为680毫米的柱系统,直径为300毫米,以模拟沙子的加压浆液渗透。安装压力传感器以估计淤浆渗透过程中滤饼的液压导电性。测量收集样品的渗滤液的电导率。结果表明,浆料中大部分细颗粒在砂试样的100-300mm的范围内。形成不透水滤饼的时间约为300秒,表示在挖掘过程中难以形成的不透水滤饼。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号