...
首页> 外文期刊>E3S Web of Conferences >Research and Analysis on the Supporting Structure of the Second Lining of the Tunnel in the Phyllite Stratum
【24h】

Research and Analysis on the Supporting Structure of the Second Lining of the Tunnel in the Phyllite Stratum

机译:局部隧道第二衬砌支撑结构的研究与分析

获取原文
   

获取外文期刊封面封底 >>

       

摘要

The reasonable construction of the secondary lining structure of the tunnel is an important link to ensure the stability of the surrounding rock of the tunnel. Taking a phyllite stratum tunnel project in Jiangxi as the background, the Flac3D finite difference software was used to numerically simulate and analyze the supporting structure of the secondary lining. The impact of support timing on surrounding rock stress. The calculation results show that with the progress of the construction step, the main period of the displacement of the vault is after the excavation of the upper section of the tunnel before the upper section support; The plastic zone of the surrounding rock changes obviously, especially above the tunnel, and finally the plastic zone develops to the ground; the stress of the surrounding rock shows a decreasing trend with the increase of the time of the secondary lining. The research results can provide certain guiding significance for the construction of the second lining of the tunnel under similar geological conditions.
机译:隧道二次衬砌结构的合理结构是确保隧道周围岩石稳定性的重要环节。服用千枚岩地层隧道工程中赣为背景,该FLAC3D有限差分软件用于数值模拟和分析的二次衬砌的支撑结构。支撑时机对周围岩石应力的影响。计算结果表明,与施工步骤的进展,拱顶的位移的主周期是上侧部支撑前隧道的上段的开挖后;周围岩石的塑料区显然变化,特别是在隧道之上,最后塑料区发展到地面;随着二次衬里的时间的增加,周围岩石的应力显示出降低趋势。在类似的地质条件下,研究结果可以为隧道的第二个衬砌构建提供一定的指导意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号