首页> 外文期刊>American Journal of Science, Engineering and Technology >Cost Optimization in Building Construction Projects with Special Reference to Kathmandu Valley of Nepal
【24h】

Cost Optimization in Building Construction Projects with Special Reference to Kathmandu Valley of Nepal

机译:尼泊尔加德满都谷的特殊参考建设建设项目的成本优化

获取原文
           

摘要

Cost optimization is a process that should be carried out throughout the construction period to ensure that the cost of the project is within an allotted budget. Time and cost are the two most significant factors in any construction project. Cost increases with the time of construction. The objective of this study was to find out the factors that contribute to the optimization of construction costs in building construction projects in Nepal. The study was conducted during the period from April 2019 to September 2020. Field observation, in-depth interviews, focus group discussions and questionnaire surveys were the major tools for the investigation of this study. The findings were analyzed in nine categories: project related factors, design related factors, owner related factors, consultant related factors, contractor related factors, material related factors, labor related factors, equipment related factors, and external factors. The study found some key factors related to time and cost overrun, optimizing cost of construction and the strategies to optimize project costs. The most important strategy to optimize the construction cost are effective cost planning and control, development of proper monitoring and tracking system, sound working environment, recording daily work progress, using time cost trade off, follow plan-do-check-act quality policy, hire skilled labor and effective supervision. The study suggests that constructability and value engineering principles should be adopted in construction projects.
机译:成本优化是一种过程,应在整个施工期间进行,以确保项目的成本在分配的预算范围内。时间和成本是任何建筑项目中最重要的因素。随着施工时的成本增加。本研究的目的是找出有助于优化尼泊尔建筑项目的建筑成本的因素。该研究在2019年4月至9月20日期间进行了该研究。现场观察,深入访谈,焦点小组讨论和调查问卷调查是调查本研究的主要工具。调查结果分析为9分类:项目相关因素,设计相关因素,所有者相关因素,顾问相关因素,承包商相关因素,材料相关因素,劳动力相关因素,设备相关因素和外部因素。该研究发现了一些与时间和成本超支的关键因素,优化建设成本和优化项目成本的策略。优化施工成本最重要的策略是有效的成本规划和控制,适当的监控和跟踪系统的开发,合理的工作环境,录制日常工作进度,使用时间成本折衷,遵循计划 - 办事处的质量政策,雇用熟练的劳动力和有效的监督。该研究表明,建筑项目应采用结构性和价值工程原则。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号