首页> 外文期刊>Technical Gazette >Risk Management of a Hydro Power Plant – Fracture Mechanics Approach
【24h】

Risk Management of a Hydro Power Plant – Fracture Mechanics Approach

机译:水电站风险管理 - 骨折力学方法

获取原文
           

摘要

Risk management of a hydro power plant has been analysed from fracture mechanics point of view. The research is focused on the risk and integrity assessment of pressure equipment in a reversible hydro power plant in order to determine to what extent it poses a risk to Bajina Basta settlement and its inhabitants. The risk matrix has been used to assess risk level according to probability and consequence in a more descriptive way, whereas the failure assessment diagram has been used as an alternative engineering approach, including level II analysis.
机译:从骨折力学的角度分析了水电站的风险管理。 该研究专注于可逆水电站压力设备的风险和完整性评估,以便确定它对Bajina Basta沉降及其居民构成风险的程度。 风险矩阵已被用于根据更具描述性方式评估风险水平,而失败评估图已被用作替代工程方法,包括II级分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号