Minimizing the Pessimistic Time of Activity in Overhaul Project

机译:最小化大修项目中活动的悲观时间

获取原文
           

摘要

The objective of this paper is to analyse some concepts of the project management techniques and the proposed mathematical model for estimating the project completion probability after crashing of PERT/CPM network. The main objective is to minimize the pessimistic time of the activity, which lies on the critical path by investing additional amounts of money to the project. The increment of the investment not only decreases the pessimistic time of the activities along the critical path, but it also decreases the expected time of activities along the critical path of the whole project duration.
机译:本文的目的是分析项目管理技术的一些概念和所提出的数学模型,用于估算Pert / CPM网络崩溃后的项目完成概率。 主要目的是最大限度地减少活动的悲观时间,这是通过投资额外的金额来实现关键路径。 投资的增量不仅降低了沿着关键路径的活动的悲观时间,而且还减少了整个项目持续时间的关键路径沿着整个项目持续时间的临界路径的预期活动时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号