German specialist SAL Heavy Lift entered the offshore renewables market at the end of 2014, transporting and installing test piles and equipment for the Wikinger wind farm in the Baltic Sea. The first phase of the pile testing campaign was launched after the Wikinger site's geotechnical investigation was completed, with SAL winning the contract from German engineering and services group Bilfinger and deploying the DP Class Ⅱ vessel Lone.
展开▼
机译:德国专家SAL Heavy Lift于2014年底进入海上可再生能源市场,为波罗的海的Wikinger风力发电场运输和安装测试桩和设备。在Wikinger场地的岩土勘查完成后,开始了桩基测试活动的第一阶段,SAL赢得了德国工程和服务集团Bilfinger的合同,并部署了DP ClassⅡ船Lone。
展开▼