...
【24h】

Dual testing is key

机译:双重测试是关键

获取原文
获取原文并翻译 | 示例
           

摘要

Both laboratory and full-scale testing are important requirements in the manufacture of docking and mooring products said survey respondents - but good intentions are not matched by best practice. Of those responsible for procuring such products, 25% admitted to focusing on price rather than the quality of their source. That concerns TMS MD Richard Hepworth, who said of the results: "Ports and contractors need to ensure that adequate testing has taken place to ensure that PIANC guidelines have been met and that test certification applies to all factories, processes and products - not just one location or component of a product range.
机译:受访者表示,实验室和全面测试都是制造对接和系泊产品的重要要求-但是良好的意愿与最佳实践不符。在采购此类产品的负责人中,有25%承认只关注价格而不是其来源的质量。这涉及到TMS的MD理查德·赫普沃斯(Richard Hepworth),他对结果表示:“港口和承包商需要确保进行了充分的测试,以确保符合PIANC准则,并且测试认证适用于所有工厂,过程和产品-不仅仅是一项产品范围的位置或组成部分。

著录项

  • 来源
    《Dredging & port construction》 |2012年第4期|p.34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号