Giant steel columns are being drilled 16 metres into the earth at Royal Oak in west London, preparing the way for twin 6.2 metre wide tunnels to be carved underground. By 2018 this muddy patch will host Crossrail, a new east-west commuter service which will bring another 1.5m people within 45 minutes of central London.
展开▼