首页> 外文期刊>Electric light & power >Generator testing for planning model and performance verification
【24h】

Generator testing for planning model and performance verification

机译:发电机测试,用于计划模型和性能验证

获取原文
获取原文并翻译 | 示例
           

摘要

Recent transmission system blackouts have emphasized the importance of accurately representing electric power generator capabilities in system models. As a result, many domestic and international system operators and reliability councils are strengthening requirements to test generators on a regular basis to verify their capabilities, to confirm proper dynamic performance of their controls, and to update computer models. The Planning Standards Subcommittee of the North American Electric Reliability Council (NERC) has developed a set of standards that includes requirements for periodic testing of main generator controls (excitation systems, power system stabilizers, governors) and validation of the mathematical models that are used to represent these systems. But, with the restructuring of the electric power industry, the responsibility for compliance with these requirements has been delegated to individual generation owners.
机译:最近的传输系统停电已经强调了在系统模型中准确表示发电机功能的重要性。结果,许多国内外系统运营商和可靠性委员会都在加强对定期测试发电机的要求,以验证发电机的能力,确认其控件的适当动态性能以及更新计算机模型。北美电力可靠性委员会(NERC)的规划标准小组委员会已制定了一套标准,其中包括对主发电机控件(励磁系统,电力系统稳定器,调速器)进行定期测试以及对用于验证的数学模型进行验证的要求。代表这些系统。但是,随着电力行业的重组,遵守这些要求的责任已下放给了各个发电所有者。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号