首页> 外文期刊>Electric power systems research >A simple and efficient method for fast analysis of renewable generation connection to active distribution networks
【24h】

A simple and efficient method for fast analysis of renewable generation connection to active distribution networks

机译:快速有效地分析可再生能源与有源配电网连接的简单有效方法

获取原文
获取原文并翻译 | 示例
           

摘要

This paper introduces a new method to analyze the connection of an intermittent generation unit to an active distribution network. This method permits the assessment of the voltage/current constraints that the unit might generate during its operation, and also the study of various smart solutions, alternative to grid reinforcement, like advanced voltage regulation schemes or generation curtailment. To do that, time series are used as inputs (for generation profiles, load profiles on the studied network, etc ...) but a clustering technique is employed to generate a limited number of equivalent scenarios in order to reduce the number of points for which a load flow is calculated. This clustering technique allows a significant reduction of the computation time, thus making it possible to simulate very effectively one or multiple years of operation of the distributed generation (DG) unit(s) in a network. These simulations give useful results such as critical yearly quantities (like for instance losses or energy curtailed) that can be used to perform a proper technical and economic analysis.
机译:本文介绍了一种新方法来分析间歇式发电单元与有源配电网的连接。这种方法可以评估设备在运行过程中可能产生的电压/电流约束,还可以研究各种智能解决方案,以替代电网加固,例如先进的电压调节方案或削减发电量。为此,将时间序列用作输入(用于生成配置文件,所研究网络上的负载配置文件等),但是采用聚类技术生成有限数量的等效方案,以减少用于计算出的潮流。这种群集技术可以显着减少计算时间,从而可以非常有效地模拟网络中分布式发电(DG)单元一年或多年的运行。这些模拟给出有用的结果,例如可用于执行适当的技术和经济分析的关键年度数量(例如损失或减少的能源)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号