...
首页> 外文期刊>Electric power systems research >Impact of equipment failures and wind correlation on generation expansion planning
【24h】

Impact of equipment failures and wind correlation on generation expansion planning

机译:设备故障和风力相关对发电扩展计划的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Generation expansion planning has become a complex problem within a deregulated electricity market environment due to all the uncertainties affecting the profitability of a given investment Current expansion models usually overlook some of these uncertainties in order to reduce the computational burden. In this paper, we raise a flag on the importance of both equipment failures (units and lines) and wind power correlation on generation expansion decisions. For this purpose, we use a biievel stochastic optimization problem, which models the sequential and noncooperative game between the generating company (GENCO) and the system operator. The upper-level problem maximizes the GENCO's expected profit, while the lower-level problem simulates an hourly market-clearing procedure, through which LMPs are determined. The uncertainty pertaining to failures and wind power correlation is characterized by a scenario set, and its impact on generation expansion decisions is quantified and discussed for a 24-bus power system.
机译:由于所有不确定性都会影响给定投资的获利能力,因此在不规范的电力市场环境下,发电扩展计划已成为一个复杂的问题。当前的扩展模型通常会忽略其中的一些不确定性,以减轻计算负担。在本文中,我们对设备故障(单位和线路)以及风力发电相关性在发电扩展决策中的重要性提出了警告。为此,我们使用biievel随机优化问题,该问题对发电公司(GENCO)与系统运营商之间的顺序和非合作博弈进行建模。上层问题最大化了GENCO的预期利润,下层问题则模拟了每小时的市场清算程序,通过该程序可以确定LMP。与故障和风电相关性相关的不确定性以情景集为特征,并针对24总线电力系统量化并讨论了其对发电扩展决策的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号