When a new COVID-19 Lighthouse Laboratory was approved in Plymouth in November 2020, the Government required a quick turnaround to set up the testing facility in order to meet demand and tackle the virus. After its proven success in supplying the Nightingale Hospitals, Totus Engineering specified Marshall-Tuff lex PowerPoles and Odyssey Bio trunking to complete the fit out. In March 2020, the Government launched facilities specifically dedicated to COVID-19 testing to support the UK's fight against coronavirus. Known as Lighthouse Laboratories, or, Lighthouse Labs, this network of "mega" testing laboratories was set up to rapidly process thousands of samples per day. The Lighthouse Lab in Plymouth will have the capacity to process up to 40,000 COVID-19 tests a day. Due to the urgent nature of the build, the Department of Health appointed Kier and Totus Engineering due to their previous performances on Nightingale Hospitals. The clients brief was for the laboratories to be operational within 11 weeks from start of works. Therefore, the entire supply chain needed to adhere to a tight schedule of deliveries to ensure all necessary installation was completed.
展开▼
机译:当一个新的Covid-19灯塔实验室于2020年11月批准普利茅斯时,政府要求快速转变,以建立测试设施,以满足需求并解决病毒。经过验证成功,供应夜莺医院,Totus Engineering指定了Marshall-Tuffle Lex Powerpoles和Odyssey Bio Stunking以完成拟合。 2020年3月,政府推出专门致力于Covid-19测试的设施,以支持英国对冠状病毒的斗争。被称为灯塔实验室,或灯塔实验室,这个网络“Mega”测试实验室被设置为迅速处理数千个每天样本。普利茅斯的灯塔实验室将有能力每天处理多达40,000个Covid-19测试。由于构建的迫切性,由于他们以前的夜莺医院表演,卫生部门任命了Kier和Totus Engineering。客户简介是为实验室在工程开始后11周内进行运作。因此,整个供应链需要遵守交付的紧张时间表,以确保完成所有必要的安装。
展开▼