首页> 外文期刊>IEEE Transactions on Energy Conversion >Integration of computer systems for California aqueduct power plant systems
【24h】

Integration of computer systems for California aqueduct power plant systems

机译:加利福尼亚渡槽电厂系统计算机系统的集成

获取原文
获取原文并翻译 | 示例
           

摘要

The California State Water Project is one of the largest water and power systems in the world and includes over 130 hydroelectric units. An overview of the planning and implementation of the control and communication systems replacement for the entire project is provided. New control system features are described, including a multi-agency control center, off-site backup control center, four area control systems, ten major pumping/generating plant control systems, and a 400 mile long fiber optical communication system.
机译:加利福尼亚州水项目是世界上最大的水和电力系统之一,包括130多个水力发电机组。提供了整个项目的控制和通信系统替换的计划和实施的概述。描述了新的控制系统功能,包括一个多机构控制中心,一个场外备用控制中心,四个区域控制系统,十个主要的抽水/发电厂控制系统以及一个400英里长的光纤通信系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号