Transient excitation boosting at Grand Coulee Third Powerplant

机译:Grand Coulee第三发电厂的瞬态励磁增强

获取原文
获取原文并翻译 | 示例
           

摘要

The design, installation, testing, and operating experience of a transient excitation boosting (TEB) system at Grand Coulee Third Powerplant on the Columbia River in Washington state is described. The installed TEB system provides significant reactive power support to the northwest power system from this 4000 MVA hydroelectric powerplant. A microprocessor-based TEB module that interfaces to existing solid-state regulators on the six Third Powerplant generators and physically fits into the limited space available was designed. Redundancy, fail-safe circuitry, and complete status indication and alarms were designed into the TEB system from the start. Installation of the TEB system involved significant changes to the regulator wiring. Also significant were the amounts of control cabling and wiring changes needed in the existing plant control systems. Power system stabilizer (PSS) control system changes were necessary to make TEB and PSS control philosophies similar.
机译:描述了在华盛顿州哥伦比亚河上的Grand Coulee第三发电厂的瞬态励磁增强(TEB)系统的设计,安装,测试和操作经验。已安装的TEB系统从该4000 MVA水力发电厂为西北电力系统提供了重要的无功功率支持。设计了一个基于微处理器的TEB模块,该模块与六个第三发电厂发电机上的现有固态调节器接口,并且物理上适合有限的可用空间。从一开始就将冗余,故障安全电路以及完整的状态指示和警报设计到TEB系统中。 TEB系统的安装涉及调节器接线的重大更改。现有工厂控制系统中所需的控制电缆和接线变更数量也很重要。电力系统稳定器(PSS)控制系统的更改对于使TEB和PSS控制理念相似是必要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号