Interface requirements of a large hydroelectric power plant with its regional load dispatch office

机译:大型水力发电厂与其区域负荷调度办公室的接口要求

获取原文
获取原文并翻译 | 示例
           

摘要

The real-time interface requirements of a large hydroelectric power plant with its regional load dispatch office are described. The operative arrangement, interfacing functions, annual and weekly generation schedule, and unit commitment are discussed. Automatic generation control, automatic bus voltage, river flow control, and operating conditions are discussed. All the functions were implemented for the Guri Hydroelectric Project in Venezuela, with total generating capacity of 10000 MW. Operation management functions are all handled by the Guri Computer Control System.
机译:描述了大型水力发电厂及其区域负荷调度办公室的实时接口要求。讨论了操作安排,接口功能,年度和每周发电计划以及机组承诺。讨论了自动发电控制,自动母线电压,河流流量控制和运行条件。委内瑞拉的古里水电项目执行了所有功能,总发电量为10000兆瓦。操作管理功能全部由Guri计算机控制系统处理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号