...
首页> 外文期刊>Energy Conversion & Management >Optimal control of time-scheduled heating, ventilating and air conditioning processes in buildings
【24h】

Optimal control of time-scheduled heating, ventilating and air conditioning processes in buildings

机译:建筑物中预定的供暖,通风和空调过程的最佳控制

获取原文
获取原文并翻译 | 示例
           

摘要

The problem of computing optimla contorl strategies for time-scheduled operation of heating, ventilating and air conditioning systems is explored. A two-zone variable air voluem heating system consisting of a 4 ton heat pump, a storage tank, water and air flwo networks and trow environmental zones is considered. The optimization problem that takes into consdieration the building oepration schedues consisting of night-setback, start-up, occupied modes and energy price discounts is formulated and solved for a given predicted weather profile. Results showing the optimal mass flow rates to the zones, air and water supply tempratures, energy input to the heat pump and the resulting zone tmepratures are given.
机译:探讨了为供暖,通风和空调系统按计划运行的最优控制策略的计算问题。考虑了一个两区可变风量加热系统,该系统由一个4吨的热泵,一个储罐,水和空气流通网络以及拖网环境区组成。针对给定的预测天气状况,制定并解决了考虑到由夜间倒退,启动,占用模式和能源价格折扣组成的建筑运行方案的优化问题。给出了显示区域最佳质量流量,空气和供水温度,输入到热泵的能量以及所得区域温度的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号