...
首页> 外文期刊>Engineering in Miniature >Gas-fired vertical boiler for the EIM Steam Plant
【24h】

Gas-fired vertical boiler for the EIM Steam Plant

机译:EIM蒸汽厂的燃气立式锅炉

获取原文
获取原文并翻译 | 示例
           

摘要

This section begins with a trial assembly. Look down onto the smokebox tubeplate, rotating it so that one of the three threaded bushes in the tubeplate lies midway between the two boiler barrel bushes. Then push the cartridge into the boiler shell, with the firebox end of the shell resting on a flat surface until the lower tubeplate stay nut comes to rest on the flat surface in line with the boiler barrel. With a straight edge, check to see that now the cartridge is inserted that all the lower stay nuts are at the same level as the end face of the boiler barrel. Withdraw the cartridge ready for soldering.
机译:本节从试行程序开始。向下看烟箱管板,旋转烟管板,使管板中的三个螺纹衬套之一位于两个锅炉桶衬套之间的中间。然后将阀芯推入锅炉壳体,壳体的火箱端放在平坦的表面上,直到下管板固定螺母与锅炉桶对齐后,落在平坦的表面上。保持笔直的边缘,检查是否已插入墨盒,确保所有下部固定螺母与锅炉桶端面处于同一高度。取出墨盒准备焊接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号