...
首页> 外文期刊>Engineering news-record >Penang Bridge Stay Replacement Project Penang, Malaysia
【24h】

Penang Bridge Stay Replacement Project Penang, Malaysia

机译:马来西亚槟城槟城大桥住宿更换项目

获取原文
获取原文并翻译 | 示例
           

摘要

With a sizable global inventory of aging bridges and growing demand for new bridges in rapidly developing economies, transportation professionals find themselves seeking best practices and better software tools for designing and sustaining bridge infrastructure. Bridge information modeling (BrIM) is an innovative approach to bridge engineering and project delivery that addresses the key challenges faced by today's bridge project stakeholders. It fosters the use of data beyond bridge design and engineering needs to inform downstream processes such as fabrication, construction, operation, maintenance and inspection. Atkins' Penang Bridge stay replacement project in Malaysia provides a good example of BrIM at work.
机译:随着全球范围内老化桥梁的大量库存以及快速发展的经济体对新型桥梁的需求不断增长,运输专业人员发现自己正在寻求最佳实践和更好的软件工具,以设计和维护桥梁基础设施。桥梁信息建模(BrIM)是一种用于桥梁工程和项目交付的创新方法,可解决当今桥梁项目利益相关者面临的主要挑战。它促进了桥梁设计和工程需求之外的数据的使用,以告知下游流程,例如制造,施工,操作,维护和检查。马来西亚Atkins的Penang Bridge桥更换项目为BrIM在工作中提供了很好的例子。

著录项

  • 来源
    《Engineering news-record》 |2010年第17期|p.89|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号