...
首页> 外文期刊>IEE proceedings. Part C >Generating capacity planning criteria determination for developing countries: case study of Nepal
【24h】

Generating capacity planning criteria determination for developing countries: case study of Nepal

机译:确定发展中国家的能力计划标准:尼泊尔的案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Reliability is virtually taken for granted in most developed countries, This is not the case in developing countries where many basic development projects compete for the available scarce resources. Many electric power projects are cancelled or postponed owing to a lack of resources, environmental problems and other social concerns. A more rational and consistent evaluation approach is therefore required to justify future power projects in developing countries. The paper describes how a basic reliability cost/worth approach to generating capacity evaluation can be used by utilities in developing countries to make decisions on future power projects. The approach is illustrated by application to the Nepal Integrated Electric Power System, which can be considered as a representative model for many electric power systems in developing countries.
机译:在大多数发达国家,可靠性几乎是理所当然的,在发展中国家,情况并非如此,因为许多基础开发项目都在争夺可用的稀缺资源。由于缺乏资源,环境问题和其他社会问题,许多电力项目被取消或推迟。因此,需要一种更加合理和一致的评估方法来证明发展中国家未来的电力项目是合理的。本文介绍了发展中国家的公用事业公司如何使用基本的可靠性成本/价值方法进行发电量评估,从而对未来的电力项目做出决策。该方法通过在尼泊尔综合电力系统中的应用得到说明,该系统可以被视为发展中国家许多电力系统的代表模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号