...
首页> 外文期刊>Environment reporter - Cases >United States v. Ameren Mo.
【24h】

United States v. Ameren Mo.

机译:美国诉AmerenMo。

获取原文
           

摘要

For the reasons set out above, 1 find that the United States has established by a preponderance of the evidence that Ameren violated the PSD and Title V provisions of the Clean Air Act. The 2007 project at Rush Island Unit 1 and the 2010 project at Rush island Unit 2 were each major modifications under the PSD provisions of the Clean Air Act. Ameren violated the requirements of the PSD program by failing to obtain a preconstruction permit and install best available pollution control technology, among other requirements. Ameren also violated Title V of the Clean Air Act and its operating permit by performing a major modification without obtaining the required permit and by not including applicable requirements in its operating permit applications. As a result, 1 will enter a finding of liability against Ameren. A status conference will be set to address remedies.
机译:出于上述原因,[1]发现美国以大量证据证明Ameren违反了《清洁空气法》的PSD和V条款。拉什岛1号机组的2007年项目和拉什岛2号机组的2010年项目都是《清洁空气法》 PSD条款的主要修改。 Ameren违反了PSD程序的要求,原因是未获得施工前许可和安装最佳的可用污染控制技术。 Ameren在未获得所需许可证的情况下进行重大修改并且未在其操作许可证申请中包括适用要求,也违反了《清洁空气法》第V条及其操作许可证。结果,1将对Ameren承担赔偿责任。将举行一次状态会议以解决补救措施。

著录项

  • 来源
    《Environment reporter - Cases》 |2017年第19期|2096-2164|共69页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号