...
首页> 外文期刊>Environment reporter >Federal Court Halts DTE, Enbridge Natural Gas Pipeline in Ohio
【24h】

Federal Court Halts DTE, Enbridge Natural Gas Pipeline in Ohio

机译:联邦法院停止俄亥俄州Enbridge天然气管道的DTE

获取原文
获取原文并翻译 | 示例
           

摘要

A federal court has temporarily halted construction of an eight-mile stretch of the Nexus natural gas pipeline in northeast Ohio, ruling the state likely didn't properly analyze environmental harm or consider alternative routes to avoid the City of Green. In a 2-1 decision, a Sixth Circuit Court of Appeals panel ruled that Green showed sufficient evidence the Ohio Environmental Protection Agency didn't follow its own procedures before approving a section of the 255-mile pipeline to run through the city's boundaries (City of Green v. Ohio EPA, 6th Cir., No. 17-4016, temporary stay granted 11/22/17).
机译:联邦法院已暂时中止在俄亥俄州东北部的八英里长的Nexus天然气管道的建设,裁定该州可能未适当分析环境危害或考虑采用其他路线来避开绿色城市。在2-1裁决中,第六巡回上诉法院小组裁定,格林在批准255英里输油管道的一部分穿过城市边界之前,没有显示足够的证据,表明俄亥俄州环境保护局未遵循其自身程序。 Green v。Ohio EPA,第6卷,第17-4016号,临时居留权于11/22/17生效)。

著录项

  • 来源
    《Environment reporter》 |2017年第47期|1179-1179|共1页
  • 作者

    Alex Ebert;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号