Appeals Court Affirms Wetlands Injunction, Delays Completion of Arkansas Power Project

机译:上诉法院确认湿地禁令,推迟完成阿肯色州电力项目

获取原文
获取原文并翻译 | 示例
           

摘要

A federal appeals court July 14 affirmed a lower court injunction, halting work under a Clean Water Act dredge-and-fill permit at the construction site of a new coal-fired power plant in Arkansas (Sierra Club v. U.S. Army Corps of Engineers, 8th Cir., No. 10-3452, 7/14/11). The U.S. Court of Appeals for the Eighth Circuit sent the case back to the U.S. District Court for the Western District of Arkansas for further proceedings on the injunction, which was issued Oct. 27, 2010. In its decision, the appeals court rejected claims by Southwestern Electric Power Co. that the Sierra Club and other environmental groups, as well as the nearby Hempstead County Hunting Club, had failed to show "injury in fact," so they could not rightfully obtain in-junctive relief.
机译:7月14日,联邦上诉法院确认了下级法院的禁令,并根据《清洁水法》的挖泥和加注许可证中止了阿肯色州一家新建燃煤电厂的施工工作(Sierra Club诉美国陆军工程兵团, 8th Cir。,No.10-3452,7/14/11)。美国第八巡回上诉法院将该案发回阿肯色州西部地区美国地方法院,以就该禁令作出进一步诉讼。该禁令于2010年10月27日发布。在其裁决中,上诉法院驳回了上诉,西南电力公司认为,塞拉俱乐部和其他环境团体以及附近的亨普斯特德县狩猎俱乐部都没有表现出“事实上的伤害”,因此他们无法合理地获得禁制令。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号