...
首页> 外文期刊>Environment reporter >EPA Defends Action to 'Veto' Permit, Says Mountaintop Mine Challenge Premature
【24h】

EPA Defends Action to 'Veto' Permit, Says Mountaintop Mine Challenge Premature

机译:山顶矿山挑战过早,美国环保署为“否决”许可证辩护

获取原文
获取原文并翻译 | 示例
           

摘要

The Environmental Protection Agency has defended its pending "veto" action on a mountaintop mining permit by telling a federal court that the legal challenge from Arch Coal Inc. subsidiary Mingo Logan Coal Co. is premature, coming as it did before the EPA action has become final and before administrative remedies have been exhausted (Mingo Logan Coal Co. v. EPA, D.D.C., No. l:10-cv-00541, motion to dismiss filed 6/7/10).
机译:环境保护局通过告诉联邦法院,Arch Coal Inc.的子公司Mingo Logan Coal Co.提出的法律挑战为时过早,为环境保护悬而未决的行动进行了辩护,就像在EPA行动成为之前一样。在未用尽行政补救措施之前作了最后的决定(Mingo Logan Coal Co.诉EPA,DDC,第1:10-cv-00541号,撤消动议的请求日期为6/7/10)。

著录项

  • 来源
    《Environment reporter》 |2010年第25期|P.1361|共1页
  • 作者

    Alan Kovski;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号