...
首页> 外文期刊>Fairplay solutions with newbuildings >Licence row knocks chart permit service off track
【24h】

Licence row knocks chart permit service off track

机译:许可证行导致图表许可证服务偏离轨道

获取原文
获取原文并翻译 | 示例
           

摘要

A dispute between hydrographic offices over the licensing arrangements for electronic navigation charts (ENCs) and the due date for payments has delayed rollout of Datema's ENCTrack service, which was launched at Nor-Shipping.rnSubscribers to ENCTrack, which is compatible with any available ECDIS system and complies with worldwide ECDIS 2012 regulations, were to have been provided with a global folio of ENC permits valid for two months, allowingrnvessels to install all available ENCs on to its ECDIS. Once entered into the ENCTrack system, the vessel would be tracked at minimum intervals of 1.5 hours.Should the vessel enter cells outside its licence, those cells would be registered automatically with Primar and the charged accordingly.
机译:水文部门之间关于电子航海图(ENC)的许可安排和付款到期日之间的纠纷推迟了Datema的ENCTrack服务的推出,该服务于Nor-Shipping启动。rn ENCTrack的订户与任何可用的ECDIS系统兼容并符合全球ECDIS 2012法规,并且已向全球提供了有效期为两个月的ENC许可证书,允许船只将所有可用的ENC安装到其ECDIS上。进入ENCTrack系统后,将至少以1.5小时的间隔跟踪船只,如果船只进入许可证以外的牢房,这些牢房将自动向Primar注册并收取费用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号