...
首页> 外文期刊>Fairplay International Shipping Weekly >Phased fleet-wide installations
【24h】

Phased fleet-wide installations

机译:分阶段在整个车队范围内安装

获取原文
获取原文并翻译 | 示例
           

摘要

Saga Shipholding, the Norwegian open-hatch bulk carrier subsidiary of Nippon Yusen Kaisha (NYK), has been steadily getting ready for the ratification of the Ballast Water Management Convention since 2010. According to Nils Otto Bjorhovde, Technical Manager at Saga Shipholding, the company plans to retrofit its 24 sophisticated open-hatch bulk carriers with BWT systems by 2016, and Goltens Green Technologies is supporting the shipowner in the process. For the past few years, Saga Shipholding has been proactively undertaking 3D scanning and detailed engineering design projects for its carriers. Each carrier type has a completely different design but within each class the design is very similar. The small differences are taken out by the laser scanning adjusted in the detailed drawings.
机译:Nippon Yusen Kaisha(NYK)的挪威露天孵化散货船子公司Saga Shipholding自2010年以来一直在稳步为批准《压载水管理公约》做准备。根据Saga Shipholding技术经理Nils Otto Bjorhovde的说法,该公司计划在2016年之前将其24台复杂的开放式散装货船改装为BWT系统,而Goltens Green Technologies正在此过程中为船东提供支持。在过去的几年中,Saga Shipholding一直积极为其承运人进行3D扫描和详细的工程设计项目。每种载体的设计都完全不同,但是在每种类别中,设计都非常相似。细微的差异是通过详细图纸中调整的激光扫描得出的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号