...
首页> 外文期刊>Fibres & textiles in Eastern Europe >Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry
【24h】

Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry

机译:确定生产周期时间要素的随机模型:以塞尔维亚纺织业为例

获取原文
获取原文并翻译 | 示例
           

摘要

The paper presents an original method of determining the elements of the production cycle time by using the modified work sampling method applied to a textile factory. It is shown that the movement of the elements of time can be viewed as a process and in the mathematical sense can establish control limits of error of +/- 3 SD. The mean time of the production cycle of the groups created by the number of pieces in the series t(pcu) moving the hyperbolic function, which has the asymptote c, a function of the form (t) over bar (pcu) = c + b/log n, where all groups of the production cycle in the mathematical sense do not act like strata but are function tpci, related to technology and deterministic factors of the production series.
机译:本文提出了一种通过使用应用于纺织工厂的改进的工作抽样方法来确定生产周期时间要素的原始方法。结果表明,时间元素的运动可以看作是一个过程,并且在数学意义上可以建立+/- 3 SD的误差控制极限。通过移动双曲函数t(pcu)的序列中的件数创建的组的生产周期的平均时间,该函数具有渐近线c,其函数形式为(t)超过bar(pcu)= c + b / log n,从数学意义上讲,生产周期的所有组都不像阶层那样起作用,而是函数tpci,与生产序列的技术和确定性因素有关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号