首页> 外文期刊>Fuel >Partial O_2-fired coal power plant with post-combustion CO_2 capture: A retrofitting option for CO_2 capture ready plants
【24h】

Partial O_2-fired coal power plant with post-combustion CO_2 capture: A retrofitting option for CO_2 capture ready plants

机译:带有燃烧后CO_2捕集的部分燃烧O_2的燃煤电厂:CO_2捕集就绪电厂的改造选项

获取原文
获取原文并翻译 | 示例
           

摘要

In the work presented in this paper, an alternative process concept that can be applied as retrofitting option in coal-fired power plants for CO_2 capture is examined. The proposed concept is based on the combination of two fundamental CO_2 capture technologies, the partial oxyfuel mode in the furnace and the post-combustion solvent scrubbing. A 330 MW_(el) Greek lignite-fired power plant and a typical 600 MW_(el) hard coal plant have been examined for the process simulations. In a retrofit application of the ECO-Scrub technology, the existing power plant modifications are dominated by techno-economic restrictions regarding the boiler and the steam turbine islands. Heat integration from processes (air separation, CO_2 compression and purification and the flue gas treatment) can result in reduced energy and efficiency penalties. In the context of this work, heat integration options are illustrated and main results from ther-modynamic simulations dealing with the most important features of the power plant with CO_2 capture are presented for both reference and retrofit case, providing a comparative view on the power plant net efficiency and energy consumptions for CO_2 capture. The operational characteristics as well as the main figures and diagrams of the plant's heat balances are included.
机译:在本文介绍的工作中,研究了可替代方法的概念,该概念可以用作燃煤电厂的CO_2捕集的改造选项。提出的概念基于两种基本的CO_2捕集技术的组合,即炉中的部分含氧燃料模式和燃烧后溶剂洗涤。已对330兆瓦(电)希腊褐煤发电厂和典型的600兆瓦(电)硬煤电厂进行了过程仿真。在ECO-Scrub技术的翻新应用中,现有的电厂改型主要是关于锅炉和汽轮机岛的技术经济限制。过程中的热集成(空气分离,CO_2压缩和净化以及烟气处理)可以减少能源和效率的损失。在这项工作的背景下,举例说明了热集成方案,并提供了热力学模拟的主要结果,这些结果涉及具有CO_2捕集的电厂的最重要特征,供参考和改造案例使用,以提供电厂的比较视图捕集二氧化碳的净效率和能源消耗。包括运行特性以及工厂热平衡的主要图形。

著录项

  • 来源
    《Fuel》 |2009年第12期|2428-2436|共9页
  • 作者单位

    Institute for Solid Fuels Technology and Applications, Centre for Research and Technology Hellas, 4th km. N.R. Ptolemais - Kozani, 50200 Ptolemais, Greece;

    Institute for Solid Fuels Technology and Applications, Centre for Research and Technology Hellas, 4th km. N.R. Ptolemais - Kozani, 50200 Ptolemais, Greece;

    Institute for Solid Fuels Technology and Applications, Centre for Research and Technology Hellas, 4th km. N.R. Ptolemais - Kozani, 50200 Ptolemais, Greece;

    Institute for Solid Fuels Technology and Applications, Centre for Research and Technology Hellas, 4th km. N.R. Ptolemais - Kozani, 50200 Ptolemais, Greece;

    RWE Npower plc, Electron Building, Windmill Hill Business Park. Whitehill Way. SWINDON, UK;

    RWE Npower plc, Electron Building, Windmill Hill Business Park. Whitehill Way. SWINDON, UK;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    ECO-Scrub; lignite-fired power plants; CO_2 capture and storage; oxyfuel; post-combustion CO_2 capture;

    机译:生态磨砂;褐煤发电厂;CO_2的捕获和储存;氧燃料燃烧后CO_2捕集;