首页> 外文期刊>日立造船技報 >Design and operation results of dual pressure forced circulation waste heat boilers for gas turbine co-generation plants
【24h】

Design and operation results of dual pressure forced circulation waste heat boilers for gas turbine co-generation plants

机译:燃气轮机热电厂双压力强制循环余热锅炉的设计及运行结果

获取原文
获取原文并翻译 | 示例
           

摘要

The Dual Pressure Forced Circulation Waste Heat Boiler (WHB) for shows yokkaichi sekiyu CO., LTD. Was delivered in august 1996. This WHB was designed for a gas turbine co- generatin plant which hoped to meet the power and steam demand in the refinery. We obtained good results during its performance test. This paper presents an outline of the WHB, its major specification, basic design features, Boiler construction, DE NOx system and describes field operation results.
机译:表演四日市积雪株式会社的双压力强制循环废热锅炉(WHB)。该WHB于1996年8月交付。该WHB是为一台燃气轮机联产装置设计的,该装置希望满足炼油厂的动力和蒸汽需求。我们在其性能测试中获得了良好的结果。本文介绍了WHB的概况,主要规格,基本设计特征,锅炉构造,DE NOx系统,并描述了现场运行结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号