首页> 外文期刊>Hydro Review Worldwide >Brazil's 19 MW Cavernoso 2 operating at full capacity
【24h】

Brazil's 19 MW Cavernoso 2 operating at full capacity

机译:巴西的19兆瓦Cavernoso 2满负荷运行

获取原文
获取原文并翻译 | 示例
           

摘要

Brazil's 19 MW Cavernoso 2 project is now running at full capacity following the startup of the plant's last two turbines in July, operator Compahia Paranaense de Energia (Copel) announces. The small hydro project has been operating with one 6.3 MW turbine since the Agencia Nacional de Energia Electrica gave its go-ahead for commercial operation in April. The plant is located in Brazil's southern Parana state and will feed power to about 50,000 consumers in Virmond and Candoi, Gopel said.
机译:运营商Compahia Paranaense de Energia(Copel)宣布,巴西的19兆瓦Cavernoso 2项目现在已于7月启动了该工厂的最后两台涡轮机,现已满负荷运转。自Agencia Nacional de Energia Electrica于4月份开始商业运营以来,这个小型水电项目一直使用一台6.3 MW涡轮机运行。 Gopel说,该发电厂位于巴西南部的帕拉纳州,将为维德蒙德和坎多伊的约50,000名消费者供电。

著录项

  • 来源
    《Hydro Review Worldwide》 |2013年第5期|50-50|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号