首页> 外文期刊>Hydro Review Worldwide >Modernization of 3,444 MW Ilha Solteira project nearing completion
【24h】

Modernization of 3,444 MW Ilha Solteira project nearing completion

机译:3,444 MW Ilha Solteira项目的现代化改造即将完成

获取原文
获取原文并翻译 | 示例
           

摘要

Voith Hydro says it has begun the final stages in the modernization of the 3,444 MW Ilha Solteira hydropower project. The project, owned by Companhia Energetica de Sao Paulo (CESP), is on the Parana River in Brazil's Sao Paulo state. The upgrades will give Ilha Solteira more flexibility in supplying reactive power to Brazil's electrical grid, Voith Hydro said. As part of the modernization project, Voith Hydro serviced four of the plant's 20 generators, supplied new windings, stator cores, pole coils and one new stator frame, as well as renovating the other three existing frames. The company also renovated rotor poles and supplied a partial discharge detection system.
机译:福伊特水电说,它已经开始了3444兆瓦Ilha Solteira水电项目现代化的最后阶段。该项目由巴西圣保罗公司(CESP)所有,位于巴西圣保罗州的巴拉那河上。福伊特水电说,这些升级将使Ilha Solteira在为巴西电网提供无功功率方面更具灵活性。作为现代化项目的一部分,福伊特水电为该厂的20台发电机中的4台提供了服务,为其提供了新的绕组,定子铁芯,极线圈和一个新的定子机架,并对现有的其他三个机架进行了翻新。该公司还翻新了转子磁极,并提供了局部放电检测系统。

著录项

  • 来源
    《Hydro Review Worldwide》 |2013年第5期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号