首页> 外文期刊>Hydro Review Worldwide >Water jet removes damaged spillway concrete at Simon Bolivar
【24h】

Water jet removes damaged spillway concrete at Simon Bolivar

机译:水射流清除西蒙·玻利瓦尔(Simon Bolivar)受损的溢洪道混凝土

获取原文
获取原文并翻译 | 示例
           

摘要

Corporacion Electrica Nacional, owner and operator of the 10,300 MW Simon Bolivar (Guri) project in Venezuela, used a Conjet robot to perform spillway repairs to the dam. The Simon Bolivar project, on the Caroni River in Bolivar State, began operating in 1978. Two powerhouses contain a total of 20 turbines with annual generating capacity of 47,000 GWh. The dam features steel gates on top of the concrete section that control overflow down three spillway channels. Together, these channels have a combined flow capacity of 27,000 m~3/sec.
机译:委内瑞拉10,300兆瓦西蒙·玻利瓦尔(古里)项目的所有者和运营商Corporacion Electrica Nacional使用Conjet机器人对大坝进行溢洪道维修。西蒙·玻利瓦尔(Simon Bolivar)项目位于玻利瓦尔州卡罗尼河(Caroni River)上,于1978年开始运行。两个发电站共装有20台涡轮机,年发电量为47,000 GWh。大坝在混凝土部分的顶部设有钢制闸门,可控制三个溢洪道的溢流。这些通道合在一起的总流量为27,000 m〜3 / sec。

著录项

  • 来源
    《Hydro Review Worldwide》 |2012年第2期|p.52|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号