...
首页> 外文期刊>Hydro Review Worldwide >HMV Ingenieros expanding small hydro capacity in Colombia
【24h】

HMV Ingenieros expanding small hydro capacity in Colombia

机译:HMV Ingenieros扩大哥伦比亚的小水电容量

获取原文
获取原文并翻译 | 示例
           

摘要

Colombian power and engineering company HMV Ingenieros will add up to 200 MW in small hydroelectric capacity in the coming years, news sources report. HMV has already developed the 9.8 MW Guanaquitas and 9.5 MW Caruquia projects in the country's Guadalupe River Basin, and the company is currently working on two more. They are run-of-river projects that have no reservoirs and consequently minimal environmental effects. Barroso and El Popal - each with a capacity of 20.4 MW and located in Antioquia department - are expected to come online in 2012.
机译:新闻来源报道,哥伦比亚电力和工程公司HMV Ingenieros将在未来几年增加200兆瓦的小型水力发电能力。 HMV已经在该国瓜达卢佩河流域开发了9.8兆瓦的瓜纳基塔斯和9.5兆瓦的Caruquia项目,该公司目前正在开展另外两个项目。它们是没有水库的下游项目,因此对环境的影响最小。位于安蒂奥基亚省的Barroso和El Popal容量分别为20.4 MW,预计将于2012年上线。

著录项

  • 来源
    《Hydro Review Worldwide》 |2012年第2期|p.64|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号