...
首页> 外文期刊>Hydro review >HYDR CURRENTS
【24h】

HYDR CURRENTS

机译:水电汇

获取原文
获取原文并翻译 | 示例
           

摘要

The Federal Energy Regulatory Commission has approved a cost allocation method by which Bonneville Power Administration may fund the costs of reimbursing wind projects whose generation is curtailed to make room for free excess federal hydropower resulting from high river flows in the Columbia River Basin. The rulings, issued Oct. 16, say that under its Oversupply Management Protocol, BPA would work with the U.S. Army Corps of Engineers and U.S. Department of Interior's Bureau of Reclamation to manage federal hydro generation and spill water up to dissolved gas limits. BPA then would offer low-cost or free hydropower to replace the output of thermal and other plants, with the expectation many would voluntarily reduce generation to save fuel costs.
机译:联邦能源管理委员会已经批准了一种成本分配方法,通过该方法,邦纳维尔电力管理局可以资助偿还风能项目的费用,这些风能项目的发电量被削减,以腾出空间来腾出空间,以腾出免费的多余联邦水电,这些水电来自哥伦比亚河流域。 10月16日发布的裁决说,根据其《供过于求管理协议》,BPA将与美国陆军工程兵团和美国内政部的垦殖局合作,管理联邦水力发电并将水溶解至溶解气体极限。然后,BPA将提供低成本或免费的水力发电来代替火力发电厂和其他电厂的输出,并期望许多人会自愿减少发电量以节省燃料成本。

著录项

  • 来源
    《Hydro review》 |2014年第10期|46|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号