首页> 外文期刊>Hydro review >Lifting Device Developed to Remove Stoplogs at Ivanhoe Lake Dam
【24h】

Lifting Device Developed to Remove Stoplogs at Ivanhoe Lake Dam

机译:开发了用于消除艾芬豪湖大坝停工现象的提升装置

获取原文
获取原文并翻译 | 示例
           

摘要

The seven spillway bays at Ivanhoe Lake Dam are controlled by stoplogs, with frequent installation and removal from March through November to control the lake level. The old system of manipulating the stoplogs using a an overhead gantry system was difficult and dangerous for personnel during high flow events. Dam owner the Ontario Ministry of Natural Resources (OMNR) worked with Hatch Energy to develop an electric overhead stoplog lifting device that can be remotely operated.
机译:艾芬豪湖大坝的七个溢洪道海湾均由停工控制,从3月至11月频繁安装和拆除,以控制湖泊水位。在高流量事件中,使用高架龙门系统操作停工记录的旧系统对于人员而言既困难又危险。大坝拥有者安大略省自然资源部(OMNR)与Hatch Energy合作开发了一种可以远程操作的电动高架停车位举升装置。

著录项

  • 来源
    《Hydro review》 |2011年第2期|p.56-57|共2页
  • 作者

    By Pat Cantin;

  • 作者单位

    Northeast Regional Engineering Unit,Ontario Ministry of Natural Resources;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号