首页> 外文期刊>Hydro review >Dam Safety & Security
【24h】

Dam Safety & Security

机译:大坝安全与保卫

获取原文
获取原文并翻译 | 示例
           

摘要

Echo Dam dewatering contract awarded The Bureau of Reclamation has awarded a $1.3 million contract for foundation dewatering work at Echo Dam in Utah to Foothill Engineering & Dewatering Inc. of Corona, Calif. Echo Dam is a 158-foot-high zoned eafthfill structure on the Weber River in Summit County. Part of the Weber River Project, Echo Dam was completed in 1931 to help supply supplemental irrigation water to about 109,000 acres of land west of the Wasatch Mountains. Echo Dam is operated by the Weber River Water Users Association. Foundation dewatering immediately downstream of the dam is necessary to facilitate seismic retrofit work to be done under Reclamation's Safety of Dams Program, which ensures dams are inspected for safety deficiencies and corrective actions are implemented if necessary.
机译:授予Echo大坝脱水合同垦殖局已与加利福尼亚州科罗纳的Foothill Engineering&Dewatering Inc.签订了一项130万美元的合同,用于犹他州Echo大坝的基础脱水工程。萨米特县的韦伯河。作为韦伯河项目的一部分,回声水坝于1931年完工,以帮助向沃萨奇山以西约109,000英亩的土地提供补充灌溉水。回音水坝由韦伯河水用户协会运营。大坝下游必须进行基础排水,以促进根据填海工程的《大坝安全计划》进行的地震改建工作,该计划确保检查大坝的安全性缺陷,并在必要时采取纠正措施。

著录项

  • 来源
    《Hydro review》 |2011年第5期|p.154156158|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号